    Maine Erosion and Sediment Control Practices Field Guide for Contractors. Field Guide for Contractors PDF format. The Field Guide is also available in a convenient printed wire-bound format. To order a hardcopy of this manual, contact John Maclaine (207) 615-3279. There is a charge for a hardcopy.

    Maine Erosion and Sediment Control Practices Field Guide

    erosion control blankets 39 erosion control mix 41 hydraulic mulch 43. e vegetation 44. topsoil 46 seedbed preparation 47 vegetation application 48 sodding 50 hydroseeding 50. f slopes 51. cuts and fills 53 geotextiles 55 riprap 56 gabions 61 turf-reinforced matting (trm) 63 cellular confinement systems 64 slope drains 65

    MAINE EROSION AND SEDIMENT CONTROL BEST MANAGEMENT

    MAINE EROSION AND SEDIMENT CONTROL BMPs 10/2016 THE EROSION AND SEDIMENT CONTROL PLAN All projects permitted through the DEP need an erosion and sediment control (ESC) plan; but proper planning is also important for all other projects, and especially if located in an area at risk of eroding and causing sedimentation. The ESC plan should be

    Maine Erosion and Sedimentation Control BMPs

    Riprap Slope Stabilization 3. Gabions E. WATER CONVEYANCE BMPS 1. Pipe/Culvert Installation 2. Pipe Inlet Protection 3. Pipe Outlet Protection 4. Level Spreaders 5. Vegetated Waterways 6. Riprap Waterways 7. Reinforced Waterways 8. Water Diversion 9. Temporary Slope Drains . F. STREAM 1. Temporary Stream Diversion 2. Stream Crossing G. WATER DETENTION 1. Sediment Trap 2. Sediment

    Erosion Control BMPs, Maine Department of

    Maine Erosion and Sediment Control Practices Field Guide for Contractors. Field Guide for Contractors PDF format. The Field Guide is also available in a convenient printed wire-bound format. To order a hardcopy of this manual, contact John Maclaine (207) 615-3279. There is a charge for a hardcopy.

    Maine Erosion and Sedimentation Control BMPs

    Riprap Slope Stabilization 3. Gabions E. WATER CONVEYANCE BMPS 1. Pipe/Culvert Installation 2. Pipe Inlet Protection 3. Pipe Outlet Protection 4. Level Spreaders 5. Vegetated Waterways 6. Riprap Waterways 7. Reinforced Waterways 8. Water Diversion 9. Temporary Slope Drains . F. STREAM 1. Temporary Stream Diversion 2. Stream Crossing G. WATER DETENTION 1. Sediment Trap 2. Sediment

    Erosion & Sedimentation Control, Land Resources,

    Maine Erosion and Sediment Control BMPs; Training Available . The Nonpoint Source Training Center provides training to become certified by the Department in understanding and implementing effective erosion control. See the Training Schedule for future training opportunities. Requirements. Anyone filling, displacing or exposing soil or other earthen materials, must take measures to prevent

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 D-2 RIPRAP

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 D-2 RIPRAP SLOPE STABILIZATION PURPOSE & APPLICATIONS Riprap is a permanent, erosion-resistant ground cover constructed of large, loose, angular or sub-angular (rounded) stone. Riprap may be used, as appropriate, at storm drain outlets, on channel banks and/or bottoms, roadside ditches, drop structures, at the toe of slopes, or to

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 E-3

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 E-3 PIPE OUTLET PROTECTION PURPOSE & APPLICATIONS Pipe outlet protection is a protective armor for the immediate area around the outlet of a pipe or culvert to protect it and the receiving channel from scour and deterioration. This practice is applicable to the outlets of underground conduits designed to dispose of excess surface

    PROTECTING MAINE’S NATURAL RESOURCES

    Riprap Stabilization Erosion Control Blanket Mulching Culvert Outlet Protection Construction Dewatering Vegetation Winter Stabilization. 2 PREPARING an“EROSION & SEDIMENTATION CONTROL PLAN” for MAINE CONSTRUCTION GENERAL PERMIT +++++ Background: Effective March 10, 2003, certain sized projects that involve disturbing soil and soil materials will be required to

    MaineDOT Best Management Practices for Erosion and

    III. besT ManageMenT praCTICes a. hoW To use ThIs Manual sec-III:1 b. sheeT and rIll erosIon ConTrol (sr-eC) sec-III:5 1. Hydraulic Mulch Sec-III:7 2. Hay and Straw Mulch Sec-III:9 3. Erosion Control Mix Sec-III:13 4. Erosion Control Blanket Sec-III:15 5. Turf Reinforced Matting Sec-III:19 6. Plastic Sheeting Sec-III:21 7. Riprap Sec-III:23 8. Seeding and Landscape Plantings Sec-III:25 9

    Certification in Erosion Control Practices Maine.gov

    A Company Certified in Erosion Control Practices by the Department is one that has taken the extra step to ensure, at a minimum, all its construction site supervisors individually-trained and Certified in Erosion Control Practices by Maine DEP. Companies Certified in Erosion Control Practices must resubmit a current organizational chart with the names of all site supervisors to the Department

    Construction stormwater treatment BMP removal after

    13/06/2019· Erosion prevention practices (other) Riprap: Left in place: Typically serves a permanent function for armoring, stabilizing, and protecting soil against erosion. Sediment control practices : Vehicle tracking BMPs: Removed: Removed after final site stabilization or after no longer needed (e.g., vehicles no longer entering or existing site). Perimeter controls: Varies; most are removed: May be

    Best Management Practice (BMP) Guidance Manual

    Best Management Practices are not limited to these examples; many other BMPs are acceptable. Reference tools at the end of the guide and manufacturer information to ensure BMPs are selected and installed properly. Sediment Control BMPs. SILT FENCE Silt fence is generally used as perimeter control to keep sediment on site. A silt fence slows runoff allowing water to flow through while

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 G-3

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 SECTION G-3-2 • Flow to the sediment removal structure may not exceed the sediment removal structure’s capacity to settle and filter flow or the structure’s volume capacity. • Sediment Removal Basins should discharge wherever possible to a well-vegetated buffer

    How to Get Certified, Erosion Control Practices Maine

    Step #2: Appropriately select and install at least 2 Best Management Practices. Proper installation of erosion and sedimentation control BMPs is critical to their function and effectiveness. Not every BMP is appropriate for every site and the conditions presented at each location will be unique. Consider the information provided in the training and utilize the Maine DEP Erosion Control Field Guide for Contractors regarding the selection and installation of erosion and sedimentation control BMPs.

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 I-1

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 SECTION I-1- 2 Use part of the sample for a soil test to determine lime and fertilizer needs. Run the balance of the sample(s) through a sieve analysis to determine the percent by weight passing a 200-mesh sieve. Sieve analyses can be requested from the University of Maine Soil Analytical Lab in Orono

    Maine Department of Environmental Protection

    NOTE: For guidance on erosion and sedimentation controls, consult the Maine Erosion and Sediment Control Handbook for Construction or through the use of permanent mulch or riprap. If using vegetation for stabilization, select the proper vegetation for the light, moisture, and soil conditions; amend areas of disturbed subsoils with topsoil or other organic amendments; protect seeded areas

    LAW Comply with Maine Erosion and Maine Erosion and Do you

    Erosion from Construction In 1997, the Erosion and Sedimentation Control Law came into effect. It was de-signed to prevent Maine’s waterbodies from further degradation due to soil erosion. Since July 1997, construction projects of any size must have: • Sediment control measures, such as silt fence or hay bales, placed at the

    Regulatory Overview for Road Maintenance

    Protecting Maine’s Air, Land and Water. Dustin Dorr. Bureau of Land Resources. EROSION AND SEDIMENTATION CONTROL LAW. §420-C. Erosion and sedimentation control. • A person who conducts, or causes to be conducted, an activity that involves filling, displacing or exposing soil or other earthen materials. shall.

    Best Management Practice (BMP) Guidance Manual

    EROSION STABILIZATION MATS (Turf Reinforcement Mats) These mats are designed to reinforce vegetation, withstanding higher velocity flows than erosion control blankets. They can be used as an alternative to riprap. There are 5 classes of mats based on strength. Mats are composed of non-degradable synthetic fibers, filaments, netting, and wire mesh.

    Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL

    R&O 19-5 EROSION PREVENTION AND SEDIMENT CONTROL April 2019 Chapter 6 Page 8 6.03.4 Runoff Control BMPs The purpose of runoff control BMPs is to control stormwater runoff and drainage patterns at construction sites. Runoff control BMPs shall be included in the EPSC plan. Table 6-2 is a list of approved runoff control BMPs. TABLE 6-2

    Construction stormwater treatment BMP removal after

    13/06/2019· MPCA’s 2018 Stormwater Construction Inspection Guide states that “all temporary synthetic and structural erosion prevention and sediment control BMPs (such as silt fence) must be removed on the portions of the site for which the Permittee is responsible”, and that BMPs “designed to decompose on site (such as some compost logs) may be left in place.”

    CONSTRUCTION STORMWATER

    6 I. Project Administration During construction, stormwater Best Management Practices (BMPs) must be used that manage pollutants, such as sediment, that can impact water quality. When a construction project will disturb at least one acre of soil, with few exceptions, stormwater leaving the site is regulated.

    Regulatory Overview for Road Maintenance

    • Grass shallow side slopes (3H:1V) and riprap steeper slopes • Mowing to heights of 4”-6” maintains surface protection • Install erosion control blankets or riprap for higher flows • Riprap check dams lower velocity and increase infiltration • Seed no later than September 15 (use sod or riprap after) DITCH BMPs

    LAW Comply with Maine Erosion and Maine Erosion and Do you

    the Maine the Maine Erosion and Sediment Control Law StabilizeStabilize your barebare soilssoils Protect Maine’s water for future enjoyment IT’S THE LAW ! Department of Environmental Protection Deplw0652-2004 . Erosion from Construction In 1997, the Erosion and Sedimentation Control Law came into effect. It was de-signed to prevent Maine’s waterbodies from further degradation due to soil

    Maine Department of Environmental Protection

    NOTE: For guidance on erosion and sedimentation controls, consult the Maine Erosion and Sediment Control Handbook for Construction or through the use of permanent mulch or riprap. If using vegetation for stabilization, select the proper vegetation for the light, moisture, and soil conditions; amend areas of disturbed subsoils with topsoil or other organic amendments; protect seeded areas

    Windham, Maine Soil and Erosion Control Methods

    Permanent stabilization structures such as retaining walls or rip-rap. Activities which require site plan approval from the Planning Board are to be prepared in accordance with prevailing best man-agement practices as referenced in the current issue of Maine Erosion and Sediment Control Handbook for Construction. Exempt from the requirements of this ordinance are the following: A. Activities

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 I-1

    MAINE EROSION AND SEDIMENT CONTROL BMP 3/2003 I-1 GRAVEL PIT RECLAMATION PURPOSE & APPLICATIONS Gravel pit reclamation is the stabilization of inactive borrow areas with herbaceous perennial plants. The purpose is to stabilize the soil, preventing wind or water erosion from causing on-site or off-site damage and to improve the aesthetic appeal and the ability of the site to

    14.0 BASIC STANDARDS

    06/11/2020· Erosion and Sediment Control Best Management Practices” manual published by the Bureau of Land and Water Quality, MDEP (October 2016). Details of erosion and sedimentation control during the construction of the Project are located inthe civil site plans included as Exhibit 11, -sheet C-3. Typical details are located on sheets D-1 and D-2 (Exhibit 1-1). 14.1.1 Stormwater Management

    Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL

    R&O 19-5 EROSION PREVENTION AND SEDIMENT CONTROL April 2019 Chapter 6 Page 1 Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL 6.01 General Provisions 6.02 Erosion Prevention and Sediment Control (EPSC) Standards 6.02.1 Erosion Prohibited 6.02.2 EPSC Plans 6.02.3 Approved BMPs 6.02.4 Minimum BMPs 6.02.5 Additional BMPs Required 6.02.6 Wet Weather

    Sediment control practices Vehicle tracking BMPs

    31/05/2019· This treatment area can include a sediment trap, a curved section of silt fence (i.e., with the ends turned uphill to prevent bypasses), a sediment pond, or other sediment removal device. Additionally, a pipe, culvert, or water bar can be constructed as part of the BMP if needed to prevent surface water and runoff from flowing across the entrance and out onto paved roadways.

    BEST MANAGEMENT PRACTICES GUIDE FOR MASSACHUSETTS

    BEST MANAGEMENT PRACTICES GUIDE FOR MASSACHUSETTS CRANBERRY PRODUCTION University of Massachusetts Cranberry Experiment Station Erosion and sedimentation pose problems for soil conservation and water quality maintenance. Erosion control is an important component of non-point pollution prevention programs since soil itself can be both a contaminant and a carrier of other

    CONSTRUCTION STORMWATER

    E. ROLLED EROSION CONTROL PRODUCTS (RECPS) 29-35 1. Straw 29 2. Excelsior 29 3. Coconut Fiber 30 4. Combinations 30 5. Degradable Netting 30 6. Turf Reinforcement Mat 30. 4 TABLE OF CONTENTS III. SEDIMENT CONTROL 36 A. EROSION CHECKS 73 -43 1. Silt Checks 39 2. Earth Checks 40 3. Rock Checks 41 4. Synthetic Checks 42 B. TRAPS AND BASINS 44 -47 1. Silt Traps44 2. Sediment Traps 45 3. Sediment

  •