Home--->bench height in iron ore mine

  • Selection of practical bench height in open pit mining

    Key words: Open pit mining, bench height, multi-criteria decision making. INTRODUCTION As a definition in open pit mining, bench height is the vertical distance between crest and toe of the bench (Fourie and Dohm, 1992). Determination of optimum bench height is a major concern in most open pit mines. It depends on various factors, such as the cutting height and the bucket capacity of the

    Selection of practical bench height in open pit mining

    a simple Iron ore m ine with two bench height alternatives. The results showed that, this approach can be generalized for m ore intricate situations a nd an optimum

    bench height in iron ore mine strzelnica-starachowice.pl

    Golegohar iron ore mine, Iran S. R. Dindarloo*1, N.-A. Askarnejad2 and M. Ataei2 Safety bench height/m 30 Safety bench width/m 10 Safety bench slope/u 65 Working bench height/m 15 Status of slope stability Induced collapses due to fault and joint systems

    Mining of Iron Ores IspatGuru

    14/03/2014· The height of the benches is dependent on several factors such as output requirement, shape, size and depth of occurrence of ore body, geological disturbance suffered by the ore body, hardness and compactness of the ore body, type and the size of deployed for the mining operations etc. The length of the face is dependent on various factors such as contours of deposit, output required

    STABILITY OF SLOPES IN IRON ORE MINES

    degrees. It showed that with the increase in height of the bench or depth of the mine safety factor of the bench decreases indicating less stability of the concerned slope. At the depth of 100 m, the safety factor was found to be exceeding 1.2 for slope angle less than 35 degrees. Therefore, it is

    Stability of Slopes in Iron Ore Mines ethesis

    It showed that with the increase in height of the bench or depth of the mine safety factor of the bench decreases indicating less stability of the concerned slope. At the depth of 100 m, the safety factor was found to be exceeding 1.2 for slope angle less than 35 degrees. Therefore, it is recommended to maintain the overall slope angle not steeper than 35 degrees, in the hypothetical mine

    Open pit mining SlideShare

    31/07/2017· 5 2. Bench Height: The bench height is usually decided by the economic reach of the mining equipment used in the mine. As a thumb rule, a bench height is equal to the economic bucket height of an excavator (like shovel or loader) plus 3 m. The thickness of the ore body and its dip and the thickness overburden also play a deciding role in the bench height. 6. 6 As mentioned in Coal

    Our open-pit mines LKAB

    The ore in the Svappavaara field's active open-pit mine, Leveäniemi, is extracted by mining the ore in descending levels. The thickness of the slabs, known as the bench height, is 15 metres, and the slabs are worked downwards.

    1992-8645 OPTIMIZATION OF DESIGN PARAMETERS AND

    elevation height is 202 m, the lowest elevation height is 38 m, 164 m elevation difference. Qidashan iron ore belongs to Anshan type sedimentary metamorphic ore bed of the early Sinian period, The main strata exposed in mining area are old metamorphic rock, mixed

    Notice to ASX

    pit mining at an appropriate bench height. Mining practices will include grade control utilising blast hole data. It is assumed that standard crushing and screening processes used by Rio Tinto Iron Ore will be applicable for the processing of both Arrowhead and Rhodes Ridge. Rio Tinto plans to blend ore from Arrowhead and Rhodes Ridge with ore from other Rio Tinto Iron Ore mine sites to make a

    PRE-FEASIBILITY REPORT

    Presently Daitari Hill Top Deposit is the single existing working quarry in iron ore section. Mining will be confined to Hilltop area during the proposed scheme period. In the conceptual period, attempts would be made to combine Sindurmundi deposit which has been proved to be ore bearing. Quarry benches are 7-10 m high & 15-20 m wide.

    SURFACE MINING Mining Engineering Site

    20/07/2016· Extraction The process of mining and removal of waste or ore from a mine. Grade the value of an ore, normally expressed in g/ton; Grizzly Course screening or scalping device that prevents oversized bulk material form entering a material transfer system; constructed of rails, bars, beams, etc. In situ In the natural or original position. Applied to a rock, soil, or fossil when

    Open-pit mining Wikipedia

    Open-pit mining, also known as open-cast or open cut mining, is a surface mining technique of extracting rock or minerals from the earth by their removal from an open-air pit, sometimes known as a borrow.. This form of mining differs from extractive methods that require tunnelling into the earth, such as long wall mining.Open-pit mines are used when deposits of commercially useful ore or rocks

    Iron Ore Official Minecraft Wiki

    29/03/2021· Iron ore is a mineral block found underground. It is smelted into iron ingots, which are used to make tools and armor. Deepslate iron ore is a variant found in the deepslate layer of the world, below y=0.[upcoming: JE 1.17] 1 Obtaining 1.1 Breaking 1.2 Natural generation 2 Usage 2.1 Smelting ingredient 2.2 Note blocks 3 Sounds 4 Data values 4.1 ID 5 Video 6 History 7 Issues 8 Gallery 9

    Major Mines & Projects Lac Otelnuk Project

    The mining method selected for the Project is a conventional open pit consisting of drilling and blasting and a truck and shovel operation with a designed bench height of 15 m. Trees will be cleared prior to the start of mining. Next, a mining contractor will remove the topsoil and overburden using a fleet of dozers, excavators and haul trucks. The ore and waste rock will be drilled, blasted

    Bench Height Equipment Selection Iron Ore Mining

    Table 3.5 Potential increase in ore recovery Pit In Pit Reserve @ 15m Bench height Reserve @ 3m Bench height Potential increase in Reserves Donkerpoort 2.76Mt 1.58 Mt 2.43 Mt 54% Buffelshoek-West 8.99Mt 4.68 Mt 7.10 Mt 52% Donkerpoort-West 11.41Mt 6.73 Mt 9.70 Mt 44% Kwaggashoek-East 5.81Mt 3.79 Mt 5.15 Mt 36% U Un ni iv ve er rs si it ty y o of f P Pr re et to or ri ia a e et td d S Sw wa

    Open-pit mining Wikipedia

    Open-pit mining, also known as open-cast or open cut mining, is a surface mining technique of extracting rock or minerals from the earth by their removal from an open-air pit, sometimes known as a borrow.. This form of mining differs from extractive methods that require tunnelling into the earth, such as long wall mining.Open-pit mines are used when deposits of commercially useful ore or rocks

    SURFACE MINING Mining Engineering Site

    20/07/2016· Both the overburden (if present) and the ore are typically removed in benches that vary from 9m to 30m in height. By adding additional benches, a pit of any depth can be excavated. A thick deposit requires many benches and may resemble an inverted cone, while if the deposit and overburden are relatively thin a single bench may be sufficient.

    Our open-pit mines LKAB

    The ore in the Svappavaara field's active open-pit mine, Leveäniemi, is extracted by mining the ore in descending levels. The thickness of the slabs, known as the bench height, is 15 metres, and the slabs are worked downwards.

    RTZ Iron Ore Mine, Hamersley Basin, Western Australia

    The low bench height (10m), compared with Mount Tom Price (15m) and Paraburdoo (14m), facilitates selective mining and minimises dilution, but equipment is smaller than at Hamersley’s other operations. Brockman enhances the stability and flexibility of Hamersley operations and raises the proportion of lump in Hamersley’s product mix. It is a contractor operation with management and grade control coming

    1992-8645 OPTIMIZATION OF DESIGN PARAMETERS AND

    elevation height is 202 m, the lowest elevation height is 38 m, 164 m elevation difference. Qidashan iron ore belongs to Anshan type sedimentary metamorphic ore bed of the early Sinian period, The main strata exposed in mining area are old metamorphic rock, mixed

    DUMP SLOPE STABILITY ANALYSIS

    selected iron ore open cast mine. In this process samples are collected and tests are carried out on these samples to get different geotechnical parameters. The factor of safety of different sections of the existing design of the selected mine are calculated by the help of GALENA software. In the end new design of dump slope are proposed by optimising the bench dimensions and material

    Mineralisation and Ore Type Karara Mining

    Magnetite ore is mined from a large scale (12 m bench height) open pit mine in a traditional load and haul mining operation using conventional face shovels, large capacity (230 tonne) off-road haul trucks, a fleet of large diameter blast-hole drill rigs and a range of ancillary mobile mining equipment.

    The application of a blast audit for production improvement

    ABSTRACT: An audit of the blasting operation at a large iron ore mine in North America was used to improve production and lower costs. The audit reviewed the blasting practices in order to identify oppor- tunities for operational improvements. The approach taken in the audit was to evaluate general blasting practices, determine the effect of these practices on downstream processes and to

    Major Mines & Projects Lac Otelnuk Project

    The mining method selected for the Project is a conventional open pit consisting of drilling and blasting and a truck and shovel operation with a designed bench height of 15 m. Trees will be cleared prior to the start of mining. Next, a mining contractor will remove the topsoil and overburden using a fleet of dozers, excavators and haul trucks. The ore and waste rock will be drilled, blasted, and then loaded with large mining

    Bench Height Equipment Selection Iron Ore Mining

    Table 3.5 Potential increase in ore recovery Pit In Pit Reserve @ 15m Bench height Reserve @ 3m Bench height Potential increase in Reserves Donkerpoort 2.76Mt 1.58 Mt 2.43 Mt 54% Buffelshoek-West 8.99Mt 4.68 Mt 7.10 Mt 52% Donkerpoort-West 11.41Mt 6.73 Mt 9.70 Mt 44% Kwaggashoek-East 5.81Mt 3.79 Mt 5.15 Mt 36% U Un ni iv ve er rs si it ty y o of f P Pr re et to or ri ia a e et td d S Sw wa

    Glossary of Mining Terms

    Bank height or bench height the vertical height of a bank measured between its highest point (crest) The bench height is designed by the mine planner. The main constraint on height of bench is usually the limiting thickness that can be handled by the drills and/or the loading equipment. Bench Face Slope the angle measured in degrees between the toe of the bench and the crest

    Surface mining planning and design of open pit mining

    09/01/2016· The height will depend on : i) The physical characteristics of the deposit; ii) The degree of selectivity required in separating the ore and waste with the loading equipment; the rate of production; iii) The size and type of equipment to meet the production requirements; and iv) The climatic conditions. The bench height should be set as high as possible within the limits of the size and type

    1992-8645 OPTIMIZATION OF DESIGN PARAMETERS AND

    elevation height is 202 m, the lowest elevation height is 38 m, 164 m elevation difference. Qidashan iron ore belongs to Anshan type sedimentary metamorphic ore bed of the early Sinian period, The main strata exposed in mining area are old metamorphic rock, mixed

    SURFACE MINING METHODS WordPress

    bench height and 1-32 benches in the terrace). Examples of this type of mining are the German lignite mines (where bucket-wheel excavators are used to excavate the overburden a typical example of a continuous excavating system) and, to a lesser extent, some coal mines in the UK. In these cases, trucks and shovels are used to work 10 benches simultaneously to expose the coal seams

    Notice to ASX

    and shovel open pit mining at an appropriate bench height. Mining practices will include grade control utilising blast hole data. It is assumed that standard crushing and screening processes used by Rio Tinto Iron Ore will be applicable for the processing of Western Hill. Rio Tinto plans toblend ore from Western Hill with ore from other Rio Tinto Iron Ore mine sites to make a . Rio Tinto

    DUMP SLOPE STABILITY ANALYSIS

    selected iron ore open cast mine. In this process samples are collected and tests are carried out on these samples to get different geotechnical parameters. The factor of safety of different sections of the existing design of the selected mine are calculated by the help of GALENA software. In the end new design of dump slope are proposed by optimising the bench dimensions and material

    Regression Models of the Impact of Mining and Blasting

    of iron ore surface blasting, based on the blasting data published for the year 1970 for 10 large scale iron ore surface mines which operated in the former Soviet Union [6]. 2. Indices of Blasting Effectiveness 2.1. Oversize Generation Oversize generation is a quality index of blasting effec-tiveness, characterizing the percentage of the blasted

    On The Bench: Iron Ore Australian Mining

    17/04/2015· Iron ore has plummeted through every price floor announced by the pundits, and has punched below the US$50 mark. New reports suggest China

    The application of a blast audit for production improvement

    ABSTRACT: An audit of the blasting operation at a large iron ore mine in North America was used to improve production and lower costs. The audit reviewed the blasting practices in order to identify oppor- tunities for operational improvements. The approach taken in the audit was to evaluate general blasting practices, determine the effect of these practices on downstream processes and to

  •